Practical writing for die-casting, stamping and moulding teams. How to keep tooling, quality and audit evidence tied to the work that produced it.

Latest articles
TOOL · DIE SET
Tooling
What software actually tracks tooling history and die maintenance?

Tool trackers built for construction crews and CMMS built for pumps both miss what a die record has to hold. The software question is really a records question: repairs, services, counts and spares as one story that reads back on demand.

September 3, 2026
TOOL · DIE SET
Tooling
How do you set minimum stock levels for critical spares?

The empty shelf on breakdown day and keeping two of everything are both failures of policy. A minimum is built from lead time, real usage and what a stockout costs, and wear parts and failure parts are stocked on different logic.

August 21, 2026
TOOL · DIE SET
Tooling
Should die PM run on shot count or the calendar?

A die does not wear by the week. It wears by the hits it makes. Service it on a calendar and you either strip a healthy die too early or lose a good one mid run. The trigger has to match how the tool actually ages.

August 21, 2026
TOOL · DIE SET
Tooling
What an auditor wants to see about your critical spares

Proving critical spares are a controlled system, not a shoebox. The minimum-stock, movement and consumption records an auditor wants to see for a die or line, and why a full shelf is not evidence.

August 20, 2026
TOOL · DIE SET
Tooling
What an auditor wants to see in a die's maintenance history

When an auditor asks for the full maintenance history of a die, the last PM sheet is only part of the answer. The job cards, repairs, PM against produced-part counts, spare usage and release history all belong on the die record together.

August 20, 2026
TOOL · DIE SET
Tooling
Tooling history is not a folder

When the auditor asks for the full service history of a tool, a folder of maintenance reports is only part of the answer. The job cards, repairs, PM records, spares usage and release history all belong together.

June 6, 2026
Newsletter

Evidence, in your inbox

Short, practical notes on control, tooling and audit evidence for SME manufacturers. No noise.