Resources

Notes on control, tooling and evidence

Practical writing for die-casting, stamping and moulding teams. How to keep tooling, quality and audit evidence tied to the work that produced it.

Latest articles
TOOL · DIE SET
Tooling
The preventive maintenance that never happens

Everyone agrees preventive maintenance matters. Then it slips, because the schedule lives in one place and the work lives in another. Here is why PM quietly falls behind, and what it looks like when the schedule advances itself.

July 21, 2026
CONTROL · SPCUCLLCL
Quality Control
Capturing quality data on a shop floor with dead wifi zones

Every plant has them: the corner behind the press line, the cell inside a steel enclosure, the spot where the tablet loses signal. If your quality capture dies with the wifi, the data ends up on paper. It does not have to.

July 17, 2026
CONTROL · SPCUCLLCL
Quality Control
Why SPC data cannot answer an auditor

A Cpk number in a spreadsheet is not process capability evidence. Without the characteristic, the specification limits, the sample window and the revision behind it, the number cannot answer the question an auditor actually asks.

July 4, 2026
CONTROL · SPCUCLLCL
Quality Control
Control plans should drive the inspection record

When the control plan and the inspection record are separate documents, the link between requirement and measurement has to be rebuilt manually. That rebuilding is where audit evidence breaks down.

June 6, 2026
AUDIT · EVIDENCE?
VoraAudit
How VoraAudit answers "show me evidence of..."

The auditor question is not "where is your folder?" It is "show me evidence that this control was in place." VoraAudit is built to answer that question from source records, not from a parallel file cabinet.

June 6, 2026
TOOL · DIE SET
Tooling
Tooling history is not a folder

When the auditor asks for the full service history of a tool, a folder of maintenance reports is only part of the answer. The job cards, repairs, PM records, spares usage and release history all belong together.

June 6, 2026
AUDIT · RECORDS
Evidence Control
Why manufacturers scramble before audits

The records existed. The work was done. But when the auditor arrives, teams spend days reconstructing evidence that should have been automatic.

June 6, 2026
CONTROL · PLAN
Manufacturing Control
Why manufacturing records disappear in spreadsheets

The spreadsheet has the number. But it does not know which tool made the part, which revision was active, who captured the measurement, or what happened when it went out of spec.

June 6, 2026
Newsletter

Evidence, in your inbox

Short, practical notes on control, tooling and audit evidence for SME manufacturers. No noise.

Get started

Tooling, quality and audit evidence on one foundation

See how records written as the work happens become the evidence you need later.

Start free trialSee how it works